Do you need planning permission for solar in Hendon?

Home Comfort Enterprises editorial team · · 5 min read

Quick answer

  • Hendon ward holds two of Barnet's 16 conservation areas: Hendon The Burroughs, whose Article 4 record lists the solar class (Part 14, Class A), and Hendon Church End, which has no direction recorded.
  • Under the permitted development order as amended from 27 August 2026, pitched-roof panels must not protrude more than 0.2 m or sit above the highest part of the roof, excluding chimneys.
  • In a conservation area the exclusion covers only equipment on a wall, balcony or roof enclosure that fronts a highway; roof slopes, front ones included, keep their rights unless a direction removes them.
  • A flat-roof array in a conservation area needs a prior-approval determination from the council before work starts, and a listed house needs listed building consent.
  • Part 14, Class A covers a block of flats as well as a house; in Hendon ward 44.6% of households live in purpose-built flats (Census 2021).
  • 22.7% of the Hendon constituency is green belt, but green belt is not one of the designations that tighten the solar rules.

Questions this guide answers

Do I need planning permission for solar panels in Hendon The Burroughs?
What about Hendon Church End conservation area?
Can a Colindale or Hendon block of flats have solar panels?

Want these numbers for your own roof?

Get your free, no-obligation quote

No pressure, just clear advice.

See our customer reviews