Solar · Battery · EV — Greater London

Solar Panels Edgware

Solar panels, battery storage and EV chargers for homes in and around Edgware — designed from your actual usage, installed by an MCS-certified team, and explained in plain English before you commit to anything.

Quick answer

Solar panels in Edgware:

  • Cost: the Energy Saving Trust puts a typical 4.5 kWp home system (around 12 panels) at around £7,600 installed. Your own figure comes from a survey of your roof, not a table.
  • Generation: PVGIS 5.3 estimates about 3,938 kWh a year from a 4 kWp south-facing array in Edgware, around 984 kWh per kWp.
  • Payback: on the Energy Saving Trust's table, with export payments and fuel prices as of July 2026, a London home pays back in about 9 years.
  • VAT: residential solar installations carry 0% VAT until 31 March 2027, then 5% from 1 April 2027.
  • Battery: the Energy Saving Trust puts a 5 kWh battery at around £4,600; fitting it with the panels costs less than a separate visit later.
  • Who fits it: HCE is a NAPIT member (73495), MCS-certified for solar PV via NAPIT, and a HIES Consumer Code member. Check both registers yourself.

Figures: Energy Saving Trust (solar, updated 27 August 2026; batteries, updated 19 August 2026) · HMRC VAT Notice 708/6 · PVGIS 5.3 (European Commission Joint Research Centre), run 2026-10-15. Each is cited in full further down this page.

Solar on Edgware's housing

What London Borough of Barnet is doing

What solar costs on a Edgware home

When we'd tell you not to fit solar in Edgware

What a Edgware roof actually generates

Local facts, sourced

Edgware in numbers

Every figure below comes from a named public source — the same standard we hold our savings estimates to.

  • The 2021 Census has two wards named Edgware, one in Barnet and one in Harrow, and the HA8 postcode district spans Barnet, Harrow and Brent.

    Source: ONS Census 2021 ward geography via the Nomis API (Edgware, E05013637 and E05013545); postcodes.io outcode lookup for HA8 (ONS Postcode Directory data)

  • Semi-detached houses are the largest housing type in Edgware (Barnet) ward at 39.0% of households, Edgwarebury at 49.6% and Edgware (Harrow) at 48.3%; Barnet's Edgware ward is also 15.9% detached.

    Source: ONS Census 2021, TS044 accommodation type, wards E05013637, E05013638 and E05013545, via the Nomis API

  • Edgware's three wards, Edgware (Barnet), Edgwarebury and Edgware (Harrow), had 47,820 usual residents between them (our sum of the three ward counts).

    Source: ONS Census 2021, TS001 usual residents, ward counts, via the Nomis API

  • Homes in the Hendon constituency, which takes in Barnet's Edgware ward, have a median EPC score of 75 with 68.9% at band C or above; in Harrow East, which takes in Harrow's Edgware ward, the median is 67 (band D) and 44.8% are C or above.

    Source: ONS — Energy efficiency of housing in England and Wales, EPC records to March 2025 (released 28 October 2025), table 4a; constituency assignment via postcodes.io (ONS Postcode Directory)

  • 31.5% of the Harrow East constituency (790 of 2,500 hectares) and 22.7% of the Hendon constituency are designated green belt, as at 31 March 2025.

    Source: MHCLG — Local authority green belt statistics for England 2024-25, live tables (Area by PCON)

  • Harrow adopted the Stanmore and Edgware Conservation Areas supplementary planning document in December 2013; Edgware High Street conservation area has no Article 4 direction, while the Canons Park Estate does.

    Source: London Borough of Harrow — Stanmore and Edgware conservation areas (harrow.gov.uk)

  • The Watling Estate, in Burnt Oak ward, is one of Barnet's 16 conservation areas and has no Article 4 direction in Barnet's records.

    Source: planning.data.gov.uk — conservation-area and article-4-direction datasets, London Borough of Barnet

  • The nearest Met Office climate station, at Hampstead, averaged 1,559 hours of sunshine a year over 1991–2020.

    Source: Met Office — Hampstead location-specific long-term averages, 1991–2020 (metoffice.gov.uk, station gcpv7fnqu)

  • On the Harrow side of Edgware, the borough's climate strategy records 285 households committing to panels through the 2021 and 2022 Solar Together London rounds, 139 of them with batteries: more participants than any other London borough.

    Source: London Borough of Harrow — Living Harrow: Climate and Nature Strategy 2023–2030 (November 2023), section 2.1.3

  • Edgware town centre sits inside UK Power Networks' Eastern (EPN) licence area, on both sides of the borough boundary; home solar and battery applications exporting less than 5 kW are approved automatically.

    Source: UK Power Networks Open Data — licence boundaries dataset (town-centre point check); UKPN, Solar and storage: cost, time and what's involved

Data last reviewed: October 2026

Where we work around Edgware

Edgware solar questions

Which council deals with planning for solar panels in Edgware?
Do I need planning permission for solar panels in the Canons Park Estate?
What would a 4 kWp system generate in Edgware, and what does it cost?
Is a typical Edgware semi a good candidate for solar?

Also for Edgware homes

Solar is usually the first step, not the last. If you are comparing battery brands, we can talk you through Sigenergy batteries; if you are set on a particular battery, we can talk you through Powerwall storage; if you are wondering whether a battery would pay its way, we can talk you through solar battery installation; and if you are charging a car at home, we can talk you through home EV charger installation. Every one of them starts the same way — a free survey of your actual roof, usage and property, and a straight answer about whether it is worth doing.

Get a straight answer for your Edgware home

Get your free, no-obligation quote

No pressure, just clear advice.

See our customer reviews