Solar · Battery · EV — Surrey

Solar Panels Cranleigh

Solar panels, battery storage and EV chargers for homes in and around Cranleigh — designed from your actual usage, installed by an MCS-certified team, and explained in plain English before you commit to anything.

Solar on Cranleigh's housing

What Waverley Borough Council is doing

Local facts, sourced

Cranleigh in numbers

Every figure below comes from a named public source — the same standard we hold our savings estimates to.

  • Cranleigh's housing stock is well suited to rooftop solar: at the 2021 census, 2,033 of the built-up area's 4,792 households (42.4%) lived in detached houses and a further 25.9% in semi-detached homes — roughly two-thirds of homes are detached or semi-detached houses with their own roof, and 81.7% are houses of some type.

    Source: ONS Census 2021 (TS044 Accommodation type), Cranleigh built-up area via censusdata.uk

  • 81.7% of Cranleigh households (3,917 of 4,792) heat with mains-gas-only central heating, and just 15 households (0.3%) reported renewable-energy-only heating at the 2021 census — leaving substantial headroom for solar and low-carbon retrofit.

    Source: ONS Census 2021 (TS046 Central heating), Cranleigh built-up area via censusdata.uk

  • The Cranleigh Village Centre Conservation Area — first designated in October 1973 and most recently extended on 19 July 2016 — covers 22.35 hectares of the village centre and contains 25 statutory listed buildings (the Grade II* Church of St Nicolas plus 23 Grade II listings) alongside over 100 Buildings of Local Merit, so panel placement on these properties needs heritage-aware planning checks with Waverley Borough Council.

    Source: Cranleigh Conservation Area Appraisal, Waverley Borough Council

  • Waverley Borough Council declared a climate emergency in September 2019 and has committed to being a carbon-neutral council by 2030, with a feasibility study carried out to identify further potential renewable-energy sites across the borough.

    Source: Waverley Borough Council — Climate and Nature Strategy and Action Plan

  • Cranleigh homeowners can register for Surrey County Council's solar group-buying scheme run with iChoosr — Solar Together Surrey, since rebranded Switch Together — which runs in periodic rounds where vetted, MCS-certified installers compete in a reverse auction to cut the price of solar PV and battery installations; the 2025 round issued personal recommendations from 29 July 2025, with installations completing by March 2026.

    Source: Surrey County Council — Solar Together Surrey; Switch Together Surrey (iChoosr)

  • Cranleigh is getting one of the UK's most energy-efficient leisure buildings: the new Cranleigh Leisure Centre is designed to the Passivhaus standard — expected to be only the fourth leisure centre in the UK to achieve Passivhaus accreditation, using 60% less energy per square metre than the old building with a targeted 75% cut in operational carbon — with construction commencing autumn 2025 and opening expected in winter 2027.

    Source: Waverley Borough Council news (6 March 2025) — Green light for new leisure centre in Cranleigh; opening date per December 2025 project update

  • The made Cranleigh Neighbourhood Plan (2021–2032), formally made on 15 July 2024, includes Policy CRAN10 on energy, encouraging siting and orientation of buildings to optimise passive solar gain, provision of renewable and low-carbon energy, energy resilience, and retrofitting of older buildings.

    Source: Cranleigh Neighbourhood Plan (Referendum Version), Cranleigh Parish Council

  • Cranleigh has seen major new-build growth: Berkeley Homes won approval on appeal for phase one of its 425-home Leighwood Fields development between Alfold Road and Knowle Lane south of the High Street, and A2Dominion's separate 265-home Knowle Park scheme (outline permission granted 2017) adds further modern, solar-ready roofs on the village's south-west side.

    Source: SurreyLive — Berkeley Homes wins appeal for phase one of 425-property Cranleigh plan; A2Dominion / SurreyLive — Knowle Park, Cranleigh

  • Cranleigh sits in SSEN's Southern licence area — Scottish and Southern Electricity Networks is the distribution network operator for central southern England, including the west Surrey corridor from Guildford through Godalming to Haslemere — so solar export connections and G98/G99 notifications for GU6 homes go through SSEN, not UK Power Networks.

    Source: SSEN — Who is my distributor; Selectra UK electricity distribution network map (Surrey)

Data last reviewed: July 2026

Where we work around Cranleigh

Cranleigh solar questions

Do solar panels need planning permission in Cranleigh's conservation area?
Who handles solar grid connections for GU6 homes?
Can Cranleigh homeowners use Solar Together Surrey?
Is a new-build at Leighwood Fields or Knowle Park a good candidate for solar?
How long does solar take to pay for itself in Cranleigh?

Get a straight answer for your Cranleigh home

Get your free, no-obligation quote

No pressure, just clear advice.

See our customer reviews