Solar installation work carried out by Home Comfort Enterprises

Watford · St Albans · Hemel Hempstead · Stevenage · Hertford · Letchworth

Solar Panels Hertfordshire

Solar panels, batteries and EV chargers for Hertfordshire homes, from Borehamwood and Watford to Hitchin and Bishop’s Stortford, with each council’s rules and each estate’s consents set out plainly.

HIES Consumer Code member · NAPIT registered · MCS certified · Trustpilot reviewed

Quick answer

Solar panels in Hertfordshire:

  • PVGIS 5.3: about 3,938 to 4,034 kWh a year from a 4 kWp due-south array, across our 14 Hertfordshire town pages.
  • Met Office Rothamsted station, in Harpenden: about 1,621 hours of sunshine a year (1991–2020), against about 1,403 for the UK.
  • All 14 town centres sit in UK Power Networks' Eastern licence area, the former Eastern Electricity network.
  • Most homes in Welwyn Garden City and Letchworth need an estate consent for panels, separate from planning permission.
  • National cost anchor: around £7,600 for a typical 4.5 kWp system (Energy Saving Trust), with 0% VAT until 31 March 2027.
  • HCE: NAPIT member 73495, MCS-certified for solar PV and battery storage via NAPIT, HIES Consumer Code member HCE/A/1392.

Figures: PVGIS, Met Office, UK Power Networks, Welwyn Hatfield Borough Council, Letchworth Garden City Heritage Foundation, Energy Saving Trust, HMRC; cited in full below.

New-town terraces, market-town semis

Nine councils, net zero dates from 2030 to 2050

PVGIS 5.3, run 15 October 2026

What a Hertfordshire roof generates

One system, 14 towns: 4 kWp, 35° tilt, due south, 14% system losses, building-mounted.

PVGIS 5.3 estimated yearly output of a 4 kWp due-south array in 14 Hertfordshire towns
About kWh a year (4 kWp)About kWh per kWpYear-to-year variation
Borehamwood (Hertsmere) 3,944 986 ±167 kWh
Potters Bar (Hertsmere) 3,977 994 ±154 kWh
Watford (Watford) 3,938 985 ±156 kWh
Cheshunt (Broxbourne) 3,957 989 ±163 kWh
Hatfield (Welwyn Hatfield) 3,965 991 ±163 kWh
St Albans (St Albans) 3,975 994 ±171 kWh
Welwyn Garden City (Welwyn Hatfield) 3,977 994 ±159 kWh
Hertford (East Hertfordshire) 3,984 996 ±159 kWh
Hemel Hempstead (Dacorum) 3,965 991 ±165 kWh
Harpenden (St Albans) 3,980 995 ±164 kWh
Stevenage (Stevenage) 3,972 993 ±154 kWh
Bishop's Stortford (East Hertfordshire) 4,034 1,008 ±171 kWh
Hitchin (North Hertfordshire) 3,968 992 ±161 kWh
Letchworth Garden City (North Hertfordshire) 3,970 993 ±153 kWh

About kWh a year (4 kWp)

Borehamwood (Hertsmere)
3,944
Potters Bar (Hertsmere)
3,977
Watford (Watford)
3,938
Cheshunt (Broxbourne)
3,957
Hatfield (Welwyn Hatfield)
3,965
St Albans (St Albans)
3,975
Welwyn Garden City (Welwyn Hatfield)
3,977
Hertford (East Hertfordshire)
3,984
Hemel Hempstead (Dacorum)
3,965
Harpenden (St Albans)
3,980
Stevenage (Stevenage)
3,972
Bishop's Stortford (East Hertfordshire)
4,034
Hitchin (North Hertfordshire)
3,968
Letchworth Garden City (North Hertfordshire)
3,970

About kWh per kWp

Borehamwood (Hertsmere)
986
Potters Bar (Hertsmere)
994
Watford (Watford)
985
Cheshunt (Broxbourne)
989
Hatfield (Welwyn Hatfield)
991
St Albans (St Albans)
994
Welwyn Garden City (Welwyn Hatfield)
994
Hertford (East Hertfordshire)
996
Hemel Hempstead (Dacorum)
991
Harpenden (St Albans)
995
Stevenage (Stevenage)
993
Bishop's Stortford (East Hertfordshire)
1,008
Hitchin (North Hertfordshire)
992
Letchworth Garden City (North Hertfordshire)
993

Year-to-year variation

Borehamwood (Hertsmere)
±167 kWh
Potters Bar (Hertsmere)
±154 kWh
Watford (Watford)
±156 kWh
Cheshunt (Broxbourne)
±163 kWh
Hatfield (Welwyn Hatfield)
±163 kWh
St Albans (St Albans)
±171 kWh
Welwyn Garden City (Welwyn Hatfield)
±159 kWh
Hertford (East Hertfordshire)
±159 kWh
Hemel Hempstead (Dacorum)
±165 kWh
Harpenden (St Albans)
±164 kWh
Stevenage (Stevenage)
±154 kWh
Bishop's Stortford (East Hertfordshire)
±171 kWh
Hitchin (North Hertfordshire)
±161 kWh
Letchworth Garden City (North Hertfordshire)
±153 kWh

From Watford to Bishop’s Stortford, the town barely matters

Local facts, sourced

Hertfordshire in numbers

Council-level figures from named public sources. Where we have added council figures together, we say so.

  • DESNZ records about 24,567 solar PV installations of every size, rooftop to solar farm, across the 9 council areas our Hertfordshire towns sit in at the end of 2025, as first published (our sum). It is not a count of homes.

    Source: Department for Energy Security and Net Zero, Renewable electricity by local authority 2014 to 2025 (published 29 September 2026)

  • DVLA records about 35,306 privately kept plug-in vehicles across the same 9 council areas at the end of June 2026, up from about 25,976 a year earlier (our sum). Vehicles, not chargers or households.

    Source: Department for Transport and DVLA, VEH0142 licensed plug-in vehicles by local authority (published 23 September 2026)

  • East Herts residents installed 1,438 solar panels through the Solar Together group-buying scheme in the twelve months to August 2023, a collective investment of over £1.7 million, according to the council.

    Source: East Herts District Council, Solar panel group-buying scheme re-launches for 2023-4 (29 August 2023)

  • Watford Borough Council has fitted 144 solar panels to its Town Hall and 36 to the Colosseum, both Grade II listed and built in 1939, and 655 panels at Woodside Leisure Centre.

    Source: Watford Borough Council, news, 13 June 2023 and 8 March 2025

  • Green belt covers 81.5% of St Albans district, 78.9% of Hertsmere and 76.7% of Welwyn Hatfield, but only 17.8% of Watford borough (31 March 2025).

    Source: MHCLG, Local authority green belt statistics for England 2024-25, live table Area by LA (published 9 October 2025)

  • Since 2007 Rothamsted, in Harpenden, has been one of the three stations at the core of the Met Office’s Central England Temperature series; it averaged about 1,621 hours of sunshine a year over 1991–2020.

    Source: Met Office, UK climate series; Rothamsted location-specific long-term averages, 1991–2020

  • Every postcode on Dacorum’s eligible-postcode list for the Warm Homes: Local Grant, 119 in all, is in HP2 or HP3, which is to say Hemel Hempstead.

    Source: Dacorum Borough Council, Home energy efficiency grants and funding (page updated 6 July 2026)

  • On the Welwyn Garden City Estate Management Scheme’s fee schedule, updated 1 April 2026, photovoltaic panels are an “Environmental Project” with no application fee; a retrospective application costs £281.

    Source: WGC Estate Management Scheme, Fee Structure (wgc-ems.org)

Data last reviewed: 15 October 2026

What solar costs on a Hertfordshire home, in brief

Grants and group buying in Hertfordshire, in brief

Planning and estate consents in Hertfordshire, in brief

Connecting to the grid in Hertfordshire

When we’d tell you not to fit solar in Hertfordshire

Get a Hertfordshire quote

Solar panels in Hertfordshire: common questions

Do I need consent for solar panels in Welwyn Garden City or Letchworth?
Is Solar Together Hertfordshire open at the moment?
Can I get a grant for solar panels in Hertfordshire?
Does green belt stop me putting solar panels on my roof?
Which electricity network covers Hertfordshire?

Towns we cover

Local pages for Hertfordshire towns

Each town page carries that town’s own census housing figures, conservation areas, estate rules and council schemes, with every source named.

Get the honest numbers for your Hertfordshire home

Get your free, no-obligation quote

No pressure, just clear advice.

See our customer reviews