Hertford home batteries: UKPN, G99 and power cuts

Home Comfort Enterprises editorial team · · 6 min read

Quick answer

  • Hertford's town centre sits in UK Power Networks' Eastern Power Networks licence area, about 16.6 km from the nearest other licence area (UKPN and NESO boundary data).
  • Under ENA EREC G98, a system up to and including 16 A per phase (3.68 kW), battery included, is notified before commissioning or within 28 days; anything larger needs G99 approval before work starts.
  • A 4 kW inverter draws 17.39 A, so it is just over the G98 line and goes through G99.
  • UK Power Networks says it approves an application automatically where the maximum export, after any export limitation, is under 5 kW, and that there is nothing to pay it unless your supply needs upgrading.
  • Ofgem's 2024/25 figures for Eastern Power Networks show about 44.6 supply interruptions per 100 customers and about 32.5 minutes lost per customer, planned and unplanned, down from 46.2 and 35.6 in 2023/24.
  • A standard grid-tied battery shuts down in a power cut; backup needs extra switching equipment and chosen circuits designed in from the start.

Questions this guide answers

Do I have to contact UK Power Networks myself about a battery in Hertford?
Will a battery keep my Hertford home running in a power cut?
How do I check which network my Hertford address is on?

Want these numbers for your own roof?

Get your free, no-obligation quote

No pressure, just clear advice.

See our customer reviews