Most Croydon homeowners ask the same first question about solar: how many panels will my house take, and is that the right number? The honest answer is that the roof sets the ceiling and your electricity use sets the target. This guide works through both for Croydon, using the Energy Saving Trust’s typical system, PVGIS runs for the borough itself and DESNZ’s cost statistics, so you can read a quote against something solid.
For the wider picture of solar panels in Croydon, including the council’s schemes, the housing stock and the planning position street by street, our Croydon page has it. Here we stick to sizing. Nothing below is our price: a real figure comes from a survey.
The short answer
The Energy Saving Trust, in its solar advice updated 27 August 2026, describes the typical home system as about 4.5 kWp, using around 12 panels on 20 to 30 m² of roof and costing around £7,600 installed. That is a sensible starting point for a Croydon semi or an end-of-terrace with one good slope. A mid-terrace may take less. A larger house in Purley or Sanderstead may take more than it can use.
What it makes in Croydon is easier to pin down. We ran PVGIS 5.3, the European Commission’s solar tool, for Croydon on 14 November 2026. A 4 kWp array at 35° facing due south comes out at about 3,977 kWh a year, about 994 kWh for every kWp, give or take about 157 kWh between years.
Start with the roof, not the bedroom count
Bedrooms are a poor guide to roof space. Two three-bed houses on the same Croydon road can have very different usable areas once you take out chimney stacks, roof lights, dormers, vent pipes and the clearances an installer leaves at the edges. The Trust’s figure works out at roughly 4.4 to 6.7 m² of roof per kWp on our arithmetic, so a slope with 18 m² of clear space is in 4 kWp territory and one with 13 m² is nearer 3 kWp.
Panel ratings matter too. The Trust’s 12 panels for 4.5 kWp works out at about 375 W a panel. Higher-rated panels fit the same capacity into fewer of them, which can help on a narrow terrace roof.
What each system size makes in Croydon
| System size | Panels (approx.) | Roof area (approx.) | Due south, kWh a year | Due east or west, kWh a year |
|---|---|---|---|---|
| 3 kWp | 8 | 13–20 m² | about 2,980 | about 2,360–2,400 |
| 4 kWp | 11 | 18–27 m² | about 3,977 | about 3,140–3,200 |
| 4.5 kWp | 12 | 20–30 m² | about 4,470 | about 3,540–3,600 |
| 5 kWp | 13 | 22–33 m² | about 4,970 | about 3,930–4,000 |
| 6 kWp | 16 | 27–40 m² | about 5,960 | about 4,720–4,800 |
Panels and roof area scale the Energy Saving Trust’s typical system by size. Output is PVGIS 5.3 for Croydon (SARAH3 2005–2023, 35° tilt, 14% losses, run 14 November 2026): 994 kWh per kWp due south, 3,199 kWh due east and 3,144 kWh due west for 4 kWp. Other sizes are our arithmetic.
Which way the roof faces
Direction changes the answer more than size does on many Croydon roofs. From the same PVGIS run, a 4 kWp array makes about 3,769 kWh facing south-east and 3,732 kWh facing south-west, both within about 6% of due south. Facing due east it makes about 3,199 kWh and due west about 3,144 kWh, roughly a fifth less. Croydon Council’s own household retrofit guidance says the same thing in round numbers: east or west roofs produce about 15 to 20% less.
An east-west split is not a bad outcome. Two half-arrays on opposite slopes spread generation into the morning and the late afternoon, when many households use more, instead of a single midday peak.
Does it matter where in Croydon you live?
Hardly. We ran PVGIS at five points across the borough. A 4 kWp south-facing array comes out at about 3,977 kWh a year in Addiscombe, 3,978 kWh in South Norwood, 3,960 kWh in Thornton Heath, 3,930 kWh in Coulsdon and 3,928 kWh in Purley. That is a spread of about 1%. Shading from trees, neighbouring buildings and your own chimney will move your figure far more than your postcode.
Matching the size to what you use
Ofgem’s Typical Domestic Consumption Value, from 1 July 2026, is 2,500 kWh of electricity a year. A 4 kWp south-facing roof in Croydon makes more than that over a year, which can make a 3 kWp system sound like enough. It usually is not that simple, because the generation and the use do not arrive at the same time.
The useful number is your own. Twelve months of meter readings, or the annual figure on your bill, tell you how much you use. When you use it, during the day or in the evening, tells you how much of the generation you can use directly and how much will be exported.
Summer and winter
PVGIS puts the same 4 kWp Croydon array at about 483 kWh in June and 487 kWh in July, but only about 137 kWh in December and 150 kWh in January. December is roughly 28% of June on our arithmetic. No sensible size covers a Croydon winter from the roof alone, so sizing for winter only leads to a system that exports most of its summer output.
That is why the Energy Saving Trust says there is no exact formula for sizing a battery either, and why the honest design is built around your usage pattern rather than the biggest array the roof can hold.
Terraces, semis, larger houses and flats
Croydon’s housing makes sizing a street-by-street job. The borough’s 2023 Local Housing Needs Assessment, drawing on Census 2021, puts 41% of dwellings as flats, 24% as semi-detached houses, 23% as terraced and 12% as detached.
- Terraces in Thornton Heath and South Norwood often give one main slope plus a rear outrigger roof. The smaller rows of the table are typical here, and higher-rated panels help.
- Semis in Shirley, Selsdon and Addiscombe often have a hipped or gabled roof with one good slope, the classic home for a system around the Trust’s typical size.
- Larger houses in Purley, Coulsdon and Sanderstead may have more roof than the household needs, so the question becomes how much to fit, not how much will fit.
- Flats need the freeholder’s consent before anything goes on a shared roof, and that comes before any sizing.
The grid line: G98 or G99
Size also decides the paperwork. Under the Energy Networks Association’s rules, an inverter up to 16 A per phase, about 3.68 kW on a single-phase supply, is connected under G98 and notified within 28 days. Above that, a G99 application and the network operator’s approval come first. In Croydon that operator is UK Power Networks, and the installer makes the submission.
The limit is on the inverter, not the panels, and a battery that can export counts toward it. A 4.5 kWp array on a 3.68 kW inverter is a common way to stay within G98, at the cost of clipping a little output on the sunniest summer middays.
What each size costs
DESNZ’s solar PV cost statistics for 2025/26, published 28 May 2026, give a median of £1,595 per kW for systems up to 4 kW and £1,546 per kW for 4 to 10 kW, across MCS installations in Great Britain, with batteries excluded. On our arithmetic that is about £4,790 for 3 kWp, £6,380 for 4 kWp, £6,960 for 4.5 kWp, £7,730 for 5 kWp and £9,280 for 6 kWp. The Energy Saving Trust’s own figure for a typical 4.5 kWp system is around £7,600.
Residential solar installations carry 0% VAT until 31 March 2027, then 5% (HMRC VAT Notice 708/6). Our solar panel installation cost page breaks a quote down line by line.
Planning: when size makes a difference
For most Croydon houses, panels are permitted development, and size makes no difference as long as the panels stand no more than 0.2 m beyond the roof slope and no higher than the highest part of the roof. A flat-roof array is permitted up to 0.6 m above the roof, and in a conservation area it needs the council’s prior-approval decision first. The streets to check are those under an Article 4 Direction: read on 27 September 2026, Croydon’s appraisals show one that names solar, in Chatsworth Road. Our guide to Croydon’s conservation area rules goes through them.
Adding a battery or an EV later
If a battery or an electric car is likely in the next few years, say so at the survey. Both change how much of the generation you can use, and both can change the inverter and the G98 or G99 route. The Energy Saving Trust says fitting storage at the same time as panels costs less than a separate visit later. Our page on battery storage in Croydon covers where a battery can go in Croydon homes, and the solar panels and battery cost page adds the two halves together. For a car, see EV charger installation in Croydon.
Getting a size you can trust
A sound quote shows its working: the usable roof area, the orientation and shading it assumed, the expected yearly generation and how it was worked out, the inverter rating and whether it falls under G98 or G99, and the VAT on each line. If a quote cannot show those, ask for them. For a survey of your own roof, start from our solar panels Croydon page.