Is your Reading home's supply ready for an EV charger?

Home Comfort Enterprises editorial team · · 5 min read

Quick answer

  • SSEN says that where a property's total demand is 60 amps or less with no safety concerns, the installer can fit an EV charger and notify SSEN within 28 days; above that, a Load Check must be approved first (SSEN EV Connections, read 19 October 2026).
  • A looped property, one that shares a service cable with a neighbour, needs a Load Check before installation so SSEN can decide whether unlooping is required.
  • SSEN says older properties often have 30 A or 60 A main fuses and that it can upgrade these to 80 A or 100 A without charge (SSEN supply-change FAQs, read 19 October 2026).
  • A 7 kW charger draws 32 A continuously; domestic main fuses are commonly 60 A, 80 A or 100 A, and load management usually avoids a supply upgrade.
  • SSEN's supply checker flags a possible problem where a property's main fuse is below 80 amps or its service cable is shared with a neighbour.
  • At the 2021 Census, 28.2% of Reading's 67,682 households lived in a terrace and 25.9% in a semi (ONS TS044).

Questions this guide answers

Do I have to tell SSEN myself about a new charger in Reading?
How do I know if my Reading house has a looped supply?
Will a fuse upgrade cost me anything?