Quick answer

  • Potters Bar town centre sits well inside UK Power Networks' Eastern Power Networks licence area, the Hertfordshire network that Eastern Electricity once ran.
  • Under ENA EREC G98, type-tested generation up to and including 16 A per phase (3.68 kW) is notified before commissioning or within 28 days after; a 4 kW inverter, at 17.39 A, is over that line.
  • Above 16 A per phase a G99 application must be approved before work starts; UK Power Networks automatically approves where the maximum export after any export limitation is under 5 kW.
  • UK Power Networks says the installer contacts it on your behalf and that there is nothing to pay it unless your supply needs upgrading first.
  • Ofgem's 2024/25 figures for Eastern Power Networks show about 44.6 supply interruptions per 100 customers and about 32.5 minutes lost per customer over the year.
  • A standard grid-tied battery shuts down in a power cut; backup works only if the system and installation are designed for it.

Questions this guide answers

Will a 4 kWp system on my Potters Bar semi need G99?
What is an export limit, and will my Potters Bar system have one?
Do I need to contact UK Power Networks myself?

Want these numbers for your own roof?

Get your free, no-obligation quote

No pressure, just clear advice.