EV chargers — Surrey

EV Charger Installation Godalming

Home EV chargers for Godalming driveways, garages and, where the council allows it, on-street homes, with the supply check, the grant position and the solar pairing explained before anything is fitted.

Quick answer

EV charger installation in Godalming:

  • Speed: a 7 kW home charger adds roughly 7 kWh an hour, so a typical day's driving is back in the battery well inside an overnight window.
  • Supply: a 7 kW charger draws about 32 A continuously; the survey checks your main fuse and consumer unit first, and load management is the usual answer on a smaller supply.
  • Grid: central Godalming is on SSEN Distribution's Southern Electric Power Distribution network (homes near the edge of the area may be on South Eastern Power Networks); the charger is notified to the operator as part of the job.
  • Local uptake: DVLA records about 5,670 privately kept plug-in vehicles across Waverley (2026 Q2), up from 4,375 a year earlier.
  • Grants: up to £500 for eligible flat owner-occupiers and renters, and a £500 cross-pavement route for on-street parking, both to 31 March 2027; claims must be made through an OZEV-authorised installer, so tell us your situation at the quote stage.
  • Who fits it: HCE is a NAPIT member (73495) and a HIES Consumer Code member; the charger in our own job photos is the EnSmart SmartBee-M.

Figures: GOV.UK (OZEV chargepoint grants, to 31 March 2027) · Department for Transport and Driver and Vehicle Licensing Agency, VEH0142 (2026 Q2) · PVGIS 5.3 (European Commission Joint Research Centre). Eligibility depends on your circumstances.

How an EV charger gets fitted in Godalming

Four steps from first call to switch-on. No pressure at any stage, and a straight answer if it would not pay its way.

  1. Step 1

    Supply and parking check

  2. Step 2

    A written quote

  3. Step 3

    Installation

  4. Step 4

    Handover

Where a charger goes in Godalming's homes

Your supply, the grid and smart charging in Godalming

Can a Godalming roof charge the car?

Local facts, sourced

Godalming and home EV charging in numbers

Every figure below comes from a named public source.

  • DVLA records 5,670 privately kept plug-in vehicles across Waverley at the end of June 2026, up from 4,375 a year earlier: 1,295 more, about 30%.

    Source: DfT and DVLA, VEH0142 licensed plug-in vehicles by local authority, privately kept, end of June 2026 against end of June 2025 (published 23 September 2026); the change is our arithmetic

  • Census 2021, our sum of Godalming's five wards: 9,654 households, 30.7% semi-detached, 29.1% detached, 18.4% terraced, 15.8% in purpose-built flats and 3.3% in converted houses.

    Source: ONS Census 2021, tables TS044 (accommodation type) and TS054 (tenure), 2022 wards, via Nomis (read 16 October 2026): Godalming Binscombe, Central and Ockford, Charterhouse, Farncombe and Catteshall, Holloway (Waverley)

  • Across the same five wards, 66.9% of households own their home, 13.5% rent socially and 18.6% rent privately.

    Source: ONS Census 2021, tables TS044 (accommodation type) and TS054 (tenure), 2022 wards, via Nomis (read 16 October 2026): Godalming's five wards (Waverley)

  • The town centre is in SSEN Distribution's Southern Electric Power Distribution licence area, about 1.6 km from UK Power Networks' South Eastern Power Networks; addresses should check their operator by postcode.

    Source: NESO, GIS boundaries for GB DNO licence areas (May 2024); SSEN Distribution, Who we are

  • PVGIS puts a 4 kWp south-facing array at the Godalming town-centre point at about 489 kWh in June (about 16.3 kWh a day) and 74 kWh in December (about 2.4 kWh a day); the Wey valley horizon cuts winter sun there.

    Source: European Commission JRC, PVGIS 5.3 (4 kWp, 35°, due south, 14% losses, building-mounted, PVGIS-SARAH3 2005–2023), run 15 October 2026; daily averages are our arithmetic

  • DESNZ records about 4,325 solar PV installations of all sizes across Waverley borough at the end of 2025, with 22.57 MW of capacity.

    Source: DESNZ, Renewable electricity by local authority 2014 to 2025 (published 29 September 2026), solar PV sites and capacity at the end of 2025, as first published

  • Surrey County Council offers cable gullies to eligible residents without off-street parking: a £499 subsidised fee including a £100 non-refundable deposit, a two-year council warranty, then £4.99 a month to Kerbo Charge from year three.

    Source: Surrey County Council, Electric vehicles and our on-street chargepoint rollout, Cable Gully Installations (page reviewed 1 October 2026, read 19 October 2026): https://www.surreycc.gov.uk/roads-and-transport/sustainable-driving/electric-vehicles

  • Godalming had the world's first public electricity supply, from 26 September 1881, driven by waterwheels at Westbrook Mill on the River Wey.

    Source: Godalming Museum, Godalming & Electricity

Data last reviewed: October 2026

EV charger grants and cost in Godalming

More for Godalming homes

Godalming EV charger questions

Can I get a charger at a Godalming terrace with on-street parking?
Can I fit a charger to a listed house in Godalming?
Will my Godalming fuse take a 7 kW charger?
Can solar charge my car in Godalming in winter?

Get a straight EV charger answer for your Godalming home

Get your free, no-obligation quote

No pressure, just clear advice.

See our customer reviews