Quick answer

  • DESNZ records 4,214 solar PV installations of all sizes across North Hertfordshire at the end of 2025, with 43.22 MW of capacity, rooftops and larger sites together, as first published.
  • Letchworth Garden City Heritage Foundation's solar design principles (revised May 2026) say battery storage units and other ancillary equipment need its consent and must not be visible from the public realm.
  • Under ENA EREC G98, equipment up to 16 A per phase (3.68 kW) is notified; above that, G99 approval comes before work starts, and a battery inverter added to an existing array counts towards the total.
  • UK Power Networks says it approves an application automatically where the maximum export, after any export limitation, is under 5 kW.
  • The Energy Saving Trust says fitting storage at the same time as panels costs less than a separate visit later, puts a 5 kWh battery at around £4,600 and gives a typical lifespan of about 10 to 12 years.
  • A battery added on its own carries 0% VAT until 31 March 2027, the same as one fitted with panels, then 5% from 1 April 2027 (HMRC VAT Notice 708/6).

Questions this guide answers

Do I need the Heritage Foundation's consent to add a battery to my Letchworth panels?
Will adding a battery affect my Smart Export Guarantee payments?
My existing inverter is old. Should it be replaced when the battery goes in?